CURRENT PROJETS
As In plans of the west transport region SH-RTO Arzew
RT0 2020/ Client : Sonatrach RTO
Update of As In plans including Compressor and Pumping Stations, pipelines and terminals: PFD and P&ID, plot plans, general arrangement and layout drawing, Electrical, Instrumentation, Mechanical, Civil works and Cathodic protection.
Re-engineering of the fire protection systems of the pumping stations of the SH-RTH pipelines
RTH 2020/ Client : Sonatrach RTH
The reconfiguration of the fire protection systems of the Haoud El Hamra Transport Region, 03 departure terminals comprising pumping stations and storage farm and the 03 raw pumping stations.
Hazard studies of the new Tinhert CPF
NEW CPF TINHERT 2020/ Client : Petrofac
Completion of the HSE file including the Hazard Study, QRA Analysis, FERA Study, PII Report, of the TINRHERT field facilities at In Amenas, which mainly includes a new CPF, a gathering network of 36 wells connected to a new CPF with all the utilities associated with it.
Conceptual study of a new fuel and LPG loading ramp with a storage capacity of 20,000 m3
Arzew 2020/client : Cosider
Conceptual study of a new fully automated fuel loading station with all utilities. The project will have an overall storage capacity of 20,000 m³ and will be located in the industrial zone of Arzew on an area of 14.6 hectares